RFP (Request for Proposal)

Also: Ausschreibung, Request for Quotation, RFQ

A structured document that invites vendors to propose a solution against specified requirements, evaluation criteria and timeline. RFPs are the formal front-end of most enterprise buying processes; DecisionOS sits upstream of the RFP and downstream of it, not inside it.

An RFP formalises requirements, commercial expectations and evaluation rules before vendors respond. Done well, it compresses the buying cycle and keeps the process defensible. Done badly, it produces long vendor responses that are impossible to compare and invite the worst kind of spreadsheet acrobatics.

The decision memo is a different artefact. The memo captures why the requirements are what they are, which options are really on the table (including incumbents and status quo), the dealbreakers and weighted criteria, and the evidence behind the decision. The RFP is the request; the memo is the decision.

In practice

In regulated scopes (public-sector procurement under UVgO or VgV, DORA Art. 28 due diligence), both artefacts are expected. The memo feeds the procurement file as the auditable decision basis; the RFP documents the formal commercial process.

Related terms

Vendor matrix

A structured comparison of vendor options across weighted criteria, showing scores, evidence per cell and an aggregate result. A good vendor matrix separates dealbreakers from weighted criteria and makes every score traceable to a source.

Decision memo

A short structured document that captures why a decision was made, the options considered, the criteria and trade-offs, the stakeholders involved and the accepted risks. A good decision memo is auditable months later.

Compliance mapping

The explicit link between a decision (vendor, architecture, control) and the specific regulatory articles, controls or standards it satisfies. Without compliance mapping, a memo cannot be defended under audit against a named clause.

RTO / RPO

Two core BCM metrics. RTO = maximum downtime by which a process must be back online. RPO = maximum tolerable data loss measured in time.

SASE

Gartner architecture category combining network (SD-WAN) and security functions (SWG, CASB, ZTNA, FWaaS, RBI) on a single cloud platform. SSE is the variant without SD-WAN.

SBOM

Machine-readable inventory of all components in a software incl. versions, licences and dependencies. Formats: SPDX, CycloneDX, SWID. Mandatory in regulated areas; in the US driven by Executive Order 14028.

Schrems II

CJEU ruling of 16 July 2020 that invalidated the EU-US Privacy Shield and only allowed Standard Contractual Clauses (SCC) under additional safeguards. Consequence: third-country data transfers need a Transfer Impact Assessment (TIA) plus additional protective measures.

SIEM (Security Information and Event Management)

A platform that centralises security logs, enables long-term retention, runs correlation rules and supports investigation. SIEM is the evidence layer under EDR, XDR and SOC operations and the single largest line item in most security budgets.